Genex Power Limited
  • Home
  • About
  • Projects
    • 50MW Kidston Solar Project
    • 250MW Kidston Pumped Storage Hydro Project
    • 270MW Kidston Solar Project
    • 150MW Kidston Wind Project
    • 50MW Jemalong Solar Project >
      • Jemalong Project Details
    • Bouldercombe Battery Project
  • Corporate
    • Board & Management
    • Corporate Directory
    • Corporate Governance
  • Investors
    • Corporate Presentation
    • ASX Announcements
    • Broker Reports
    • Annual Reports
  • News, Media & Gallery
    • News
    • Media
    • Gallery
  • Contact

50MW Jemalong Solar Farm

Quick Facts:
  • Location: New South Wales
  • AC capacity: 50MW
  • DC capacity: 60MWdc
  • Capacity Factor: 29%
  • Annual output: 128,700MWh
  • Project lifespan: 30 years
  • Number of panels: ~152,000
  • Panel manufacturer: Jinko
  • Tracking system: Single-axis
  • Tracking manufacturer: NextTracker
  • Inverter manufacturer: SMA
  • Transformer manufacturer: TBD
  • Connection: Essential Energy 66kV
  • EPC & O&M contractor: Beon Energy Solutions 
  • Project cost: ~$90M 
  • Refinanced alongside KS1
Picture

Project Summary:​  
  • The Jemalong Solar Project (JSP) development is located near Forbes in the central west region of New South Wales.

  • Acquisition of JSP was completed in March 2019 from Vast Solar. The development was well advanced, with all necessary land and development planning approvals secured. 

  • Genex Power has selected Beon Energy Solutions as the preferred Engineering, Procurement and Construction (EPC) and Operations and Maintenance )(O&M) Contractor for the project. 

  • First energisation is anticipated to occur in Q4 CY2020.
Conditions of Consent
Figures 1 & 2: Jemalong Solar Farm Site Layout

Complaints and Concerns

Genex Power is committed to addressing all complaints and/or concerns regarding the Jemalong Solar Project. Local stakeholders affected by construction should contact us directly using the following methods:
  • Phone - +61 9048 8890​
  • Email - info@genexpower.com.au​

Click here to view the EIS

Click here to view the Independent Environmental Audit

Click here to view the Response to Environmental Audit

Click here to view the Jemalong Solar Farm Site Layout
​
Click here to view the Biodiversity Management Plan​

Click here to view complaints

​Click here to view the approved Jemalong Solar Farm Traffic Management Plan

Click here to view the approved Jemalong Solar Farm Environmental Management Strategy

​Click here to view the Chance Finds Protocol

​Click here to view the Landscape Plan

​Click here to view the Pre-Construction Compliance Report
Picture
Picture

Proud Sponsor of 


ASX Code: GNX

Home

About

Knowledge Sharing 

Green Financing Framework

History of Kidston Gold Mine

Contact

Copyright © 2015
  • Home
  • About
  • Projects
    • 50MW Kidston Solar Project
    • 250MW Kidston Pumped Storage Hydro Project
    • 270MW Kidston Solar Project
    • 150MW Kidston Wind Project
    • 50MW Jemalong Solar Project >
      • Jemalong Project Details
    • Bouldercombe Battery Project
  • Corporate
    • Board & Management
    • Corporate Directory
    • Corporate Governance
  • Investors
    • Corporate Presentation
    • ASX Announcements
    • Broker Reports
    • Annual Reports
  • News, Media & Gallery
    • News
    • Media
    • Gallery
  • Contact